Episode 112 ~2:00 BAS

KNX ETS5

Individual and group addresses, group objects, commissioning a lighting controller from a laptop on site, and the ETS6 differences that matter for new projects.

Animated explainer, press play to watch the concepts now; the filmed cut publishes once production wraps.

What you'll walk away with

01

Individual address = where it lives.

1.1.5 means area 1, line 1, device 5. Set once at install via the programming button on the device. Wrong area and the bus refuses to address.

02

Group address = what it does.

1/0/1 might mean "ceiling lights on/off". Bind any switch's group object to that address and the action propagates. Topology and function are separate concerns.

03

Group objects are the data points.

Each device exposes objects (switch, dim, scene). ETS5 visualises which objects are bound to which group address. Unbound objects are silent bugs.

04

Project export is the handover.

Always hand the client the .knxproj file. Without it, future modifications mean re-engineering from scratch. Saudi consultants must demand .knxproj in the as-built deliverable.

KNX ETS × commissioning

Numbers that decide whether the system commissions on day one.

ElementValue / LimitUsed for
TP1 segment length≤ 1,000 m totalLine topology
TP1 devices per line≤ 64 (256 w/ line booster)Bus capacity
TP1 line voltage29 VDC nominalBus health
IP backboneIPv4, multicast 224.0.23.12Area-to-area routing
Group address structure3-level: Main/Middle/SubBus messages
Power supply rating640 mA per line (typical)Sized to device count
Programming current draw~10 mA per deviceBus-load planning

Five decisions that ride on the ETS project

ETS is the database, the topology, and the programmer. Get the structure right at start.

Group-address schema decides scalability.

Pick 3-level (Main/Middle/Sub) or 2-level early and stick to it. A 3-level schema (e.g. 1/0/1 = Lighting / Ground floor / Room 1 ON) scales to 8 main groups, 16 middle, 256 sub, enough for any commercial building.

Topology = physical truth.

Each TP1 line: max 1,000 m, max 64 devices, single power supply. Need more? Add a line. ETS doesn't enforce this, devices register, but bus collisions and dropouts appear after commissioning if you exceed limits.

KNX Secure changes the project setup.

From ETS5.7+, security keys are mandatory for new commercial projects. Back up the project keyring; lose it and you can commission new devices but can't re-program existing ones. Owner needs the keyring at handover.

Building blocks pay back.

Build reusable templates for typical rooms (office, meeting room, corridor). One template = one group-address block mapped to standard devices. New rooms drop in as copies and re-mapping is hours not days.

Diagnostics tools beat re-programming.

Bus monitor, group monitor, and the device info dialog identify 80% of it doesn't work faults in five minutes. Reach for them before re-downloading; downloads kick devices off the bus and can mask the real fault.

Next Episode

Roadway Lighting Classes (EN 13201)

Watch next

Get the next episode by email

Practical lighting know-how from NLC Academy. No spam, unsubscribe anytime.