Every other low-current system rides on the network. NLC delivers the structured cabling, racks, and active equipment that keep BAS, security, AV, and IT traffic flowing, designed for the building's lifetime, not just its commissioning day.
Passive infrastructure is engineered to TIA/EIA and ISO/IEC standards; active equipment is sized for current load with headroom for the next refresh cycle. Both are documented, labelled, and tested before handover.
Passive and active layers, designed and delivered together.
Structured copper and fibre cabling, patch panels, racks, cable trays, faceplates, and labelling, engineered to TIA/EIA and ISO/IEC standards and fully tested before handover.
Layer 2/3 switches, wireless access points, controllers, and edge gateways, sized for the current load with headroom for the next refresh, with PoE+/PoE++ where the application calls for it.
Talk to our SID team for cabling design, equipment selection, and a fully tested handover.
NLC delivers structured cabling, racks, and active equipment that underpin BAS, security, AV, and IT traffic, split into a passive layer and an active layer designed and delivered together.
Passive infrastructure is engineered to TIA-568/569, ISO/IEC 11801, and BICSI standards, and is documented, labelled, and fully tested before handover.
NLC uses Cat 6/6A copper, OM4/OS2 fibre, and pre-terminated cabling, along with patch panels, racks, cable trays, and faceplates.
Active equipment includes Layer 2/3 switches, wireless access points, controllers, and edge gateways, sized for the current load with headroom for the next refresh, with PoE+/PoE++ where the application requires it.
NLC's networking infrastructure serves data centres, campuses, hospitals, hotels, and industrial plants.
Yes. Our active layer includes Layer 2/3 switches, wireless access points, controllers, and edge gateways, with PoE+/PoE++ provided where the application calls for it.
Yes. Both passive and active infrastructure are documented, labelled, and fully tested before handover, so the system is verified and ready on day one.
Active equipment is sized for the current load with headroom for the next refresh cycle, and passive infrastructure is engineered for the building's lifetime, not just its commissioning day.