NLC delivered a fully integrated lighting control system for the SEC 115/13.8 kV substation in Dammam. The package covered design, supply, installation and commissioning, ensuring a turnkey solution for the substation operator.
Showcases NLC's full-cycle delivery capabilities, from engineering to handover, for power-sector projects.
SEC 115/13.8 kV Substation, Dammam is a semi-government sector reference located in Dammam, Saudi Arabia, delivered in 2026. National Lighting Company (NLC) carried out the following scope on this project: lighting supply. The end user of record is Saudi Electricity Company.
Established in 1993, NLC is a Saudi lighting manufacturer headquartered in Dammam, producing LED luminaires and lighting systems in-house. Projects like this one are engineered for the demands of the Saudi environment, high ambient temperatures, dust, and a need for long, low-maintenance service life. As an authorized assembler for Schneider Electric, NLC pairs local manufacturing with international engineering standards, and supports each project with a product range spanning street, flood, architectural, and solar lighting as well as low- and medium-voltage panels, backed by technical support and after-sales service across the Kingdom.

Where is SEC 115/13.8 kV Substation, Dammam located? Dammam, Saudi Arabia.
When was the project delivered? 2026.
What did NLC provide on this project? lighting supply for Saudi Electricity Company.
Which sector does this project serve? Semi-Government.
See how NLC is illuminating Saudi Arabia's landmark buildings and infrastructure.