Episode 96 ~2:00 Fabrication

Welding, TIG, MIG & spot

Three weld types, three jobs. Where each lives in a luminaire body, a switchgear cubicle, or a steel frame, and the spec line that should pick for you.

Animated explainer, press play to watch the concepts now; the filmed cut publishes once production wraps.

What you'll walk away with

01

TIG is the slow, clean weld.

Gas tungsten arc, single-pass on thin stainless and aluminium. Beautiful bead, but a third the speed of MIG. Reserve it for joints the customer can see.

02

MIG is the production weld.

Gas metal arc, continuous wire feed. Works on 0.8–25 mm steel. Spatter cleanup is the trade. 80% of enclosure and frame work in any Saudi shop is MIG.

03

Spot welds are invisible and instant.

Resistance weld through overlapping sheet, no filler. Used inside cabinets where the joint never shows. 0.5 sec per nugget, no cleanup.

04

Edge prep decides the weld.

Mill scale, oil, primer, all defects under the bead. Grind to bright metal before any process. Skipping prep is what causes porosity nobody can chase down later.

Process × thickness × speed × cost

Indicative comparison for stitching 3 mm carbon steel parts.

ProcessThickness · SpeedCost / m
TIG (GTAW)0.5–8 mm · 0.1–0.3 m/min3–4× MIG, slowest, cleanest
MIG (GMAW)0.8–25 mm · 0.3–1.5 m/minBaseline production cost
Spot (RSW)0.5–3 mm overlap · per nugget0.3× MIG, fast, no filler
Stick (SMAW)3–25 mm · 0.2–0.5 m/minSite repair, no shielding gas
Laser hybrid2–12 mm · 1.5–4 m/min10× MIG capital, narrow HAZ

Five truths the welder already knows

Designers learn these the slow way, through warpage, porosity, and rework.

Heat input causes 90% of warpage.

A weld is a localised pour of molten metal. As it cools, it contracts and pulls the parent metal with it. Long continuous welds warp panels. Use stitch welds (20 mm on, 60 mm off) where strength allows.

Stainless welds need 2× the gas flow.

Chromium oxidises instantly at weld temperature. Argon shielding at 15 L/min protects mild steel, but stainless needs 20–25 L/min, and a back-purge if the inside surface sees food, gas, or chemicals.

Aluminium MIG needs a pulsed power source.

Aluminium melts at 660 °C but its oxide melts at 2,070 °C. A constant arc burns through before the oxide breaks. Pulsed MIG punches through the oxide on each pulse, the only reliable way for <3 mm aluminium.

Weld symbol on the drawing is the contract.

"Weld here" is not a spec. AWS A2.4 or ISO 2553 weld symbols define fillet/butt, throat thickness, both-sides, length, pitch. Without the symbol, the welder guesses and the QA inspector argues.

Pre-weld fit-up beats post-weld grinding.

A 1 mm gap on a butt joint takes 3× the filler, leaves porosity, and warps more. 0.1 mm fit-up tolerance, tack every 100 mm, then run the full weld. Spend time at the fixture, not the grinder.

Next Episode

Surface Prep: Phosphating & Sandblasting